Menu

Highline Public Schools
15675 Ambaum Blvd. SW Burien, WA 98166

Office Hours:

Monday-Friday: 7:30 a.m. - 4:30 p.m.

Hazel Valley Elementary School
402 SW 132nd Street Burien, WA 98146

You Are About To Leave the Hazel Valley Elementary School Website

You are now leaving the Highline website and will be redirected to a third-party application or website. This site may have advertisements or other content not necessarily endorsed or approved by Highline Public Schools. 

New Pacific in Design & Land Use Review Phase

New Pacific in Design & Land Use Review Phase

Project Update: Pacific

Construction Documents & Work Bids

A new Pacific Middle School is scheduled to open in fall 2027.

Design and land-use reviews are currently underway. We expect the construction documents to be completed by the end of 2024. Once finalized, Skanska, the general contractor and construction manager, will post portions of the project for bid. 

Pacific Students Move to Olympic Interim Site

Fall 2025-Spring 2027

During the two-year construction period starting in fall 2025, students will attend school at the Olympic Interim Site in Des Moines, with bus transportation provided. Olympic has housed students from Highline and Tyee high schools during their construction phases.

New School Features

The new Pacific will feature: 

  • Solar panels 
  • Angled bus parking spaces 
  • Separate driving loops for buses and cars  
  • A three-story classroom wing on the south side 
  • A warm, welcoming entrance facing 24th Avenue South 

In case you missed it this spring, see the future through this virtual reality, drone-style video that showcases the exterior of the new school from every angle. In just over a minute, fly around the exterior of the school’s design. This rendering, created by Hutteball + Oremus Architecture, gives you a detailed preview.

See Virtual Reality Video

The Pacific Middle School replacement project is part of the voter-approved 2022 school bond.